-
Project Schedule Risk Assessment Based on Bayesian Nets
Journal of Korean Society of Industrial and Systems Engineering :: Vol.39 No.1 pp.9-16
DOI:https://doi.org/10.11627/jkise.2016.39.1.009
Open abstract -
A Study on the Comparison and Application of the Methods of Measuring Projects’Progress
Journal of Korean Society of Industrial and Systems Engineering :: Vol.36 No.3 pp.87-94
DOI:https://doi.org/10.11627/jkise.2013.36.3.87
Open abstract