-
A Case Study on Lead Time Improvement Using a Simulation Approach
Journal of Korean Society of Industrial and Systems Engineering :: Vol.44 No.2 pp.140-152
DOI:https://doi.org/10.11627/jkise.2021.44.2.140
Open abstract -
Batch Scheduling Algorithm with Approximation of Job Completion Times and Case Studies
Journal of Korean Society of Industrial and Systems Engineering :: Vol.43 No.4 pp.23-32
DOI:https://doi.org/10.11627/jkise.2020.43.4.023
Open abstract -
Prediction of Tier in Supply Chain Using LSTM and Conv1D-LSTM
Journal of Korean Society of Industrial and Systems Engineering :: Vol.43 No.2 pp.120-125
DOI:https://doi.org/10.11627/jkise.2020.43.2.120
Open abstract -
Real-Time Batch Size Determination in The Production Line
Journal of Korean Society of Industrial and Systems Engineering :: Vol.42 No.1 pp.55-63
DOI:https://doi.org/10.11627/jkise.2019.42.1.055
Open abstract -
The Retrieval Batch Size for Feasible System in a Bi-directional Carousel System
Journal of Korean Society of Industrial and Systems Engineering :: Vol.36 No.3 pp.118-125
DOI:https://doi.org/10.11627/jkise.2013.36.3.118
Open abstract -
The Picking Lead Time for the Picking Batch Size in a Warehouse System
Journal of Korean Society of Industrial and Systems Engineering :: Vol.36 No.2 pp.17-24
DOI:https://doi.org/10.11627/jkise.2013.36.2.17
Open abstract