-
Determination of the Resetting Time to the Process Mean Shift based on the Cpm+
Journal of Korean Society of Industrial and Systems Engineering :: Vol.41 No.1 pp.110-117
DOI:https://doi.org/10.11627/jkise.2018.41.1.110
Open abstract -
Determination of the Resetting Time to the Process Mean Shift by the Loss Function
Journal of Korean Society of Industrial and Systems Engineering :: Vol.40 No.1 pp.165-172
DOI:https://doi.org/10.11627/jkise.2017.40.1.165
Open abstract