-
Journal of Korean Society of Industrial and Systems Engineering :: Vol.48 No.2 pp.65-85
DOI:https://doi.org/10.11627/jksie.2025.48.2.065
Open abstract -
A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System
Journal of Korean Society of Industrial and Systems Engineering :: Vol.35 No.3 pp.77-86
Open abstract -
Journal of Korean Society of Industrial and Systems Engineering :: Vol.33 No.3 pp.48-54
Open abstract -
Journal of Korean Society of Industrial and Systems Engineering :: Vol.25 No.4 pp.69-78
Open abstract