-
Two-Agent Scheduling with Sequence-Dependent Exponential Learning Effects Consideration
Journal of Korean Society of Industrial and Systems Engineering :: Vol.36 No.4 pp.130-137
DOI:https://doi.org/10.11627/jkise.2013.36.4.130
Open abstract
Two-Agent Scheduling with Sequence-Dependent Exponential Learning Effects Consideration
Journal of Korean Society of Industrial and Systems Engineering :: Vol.36 No.4 pp.130-137
DOI:https://doi.org/10.11627/jkise.2013.36.4.130
Open abstract