Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.34 No.4 pp.49-56
DOI :

요르단연구로건설사업 문서관리시스템 구축

박국남, 고영철, 우상익, 오수열, 이두정
한국원자력연구원 연구로 사업단

Establishment of Document Control System for the Jordan Research and Training Reactor Project

Kook-Nam Park, Ko Young-Cheol, Wu Sang-Ik, Oh Soo-Youl, Lee Doo-Jeong
Research Reactor Project Operation, Korea Atomic Energy Research Institute
[$AuthorMark7$]

Abstract

The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

Reference