Journal of Society of Korea Industrial and Systems Engineering Vol.34 No.3 pp.97-105
DOI :

클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형

김종열*, 강창욱**, 황인극***
한양대학교 산업공학과*, 한양대학교 ERICA캠퍼스 산업경영공학과**, 공주대학교 산업시스템공학과***

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model

Jong-Yul Kim *, Kang Chang-Wook**, Hwang In-Keuk***
Dept. of Industrial Engineering, Hanyang University*
Dept. of Industrial and Management Engineering, ERICA Campus, Hanyang University**
Dept. of Industrial and Systems Engineering, Kongju National University***
[$AuthorMark7$]

Abstract

Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.