Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.33 No.3 pp.199-207
DOI :

운용가용도 제약하에서 동류전용이 허용될 때 소모성 동시조달부품의 적정구매량 결정

오근태, 나윤균, 김명수
수원대학교 산업정보공학과

Provisioning Quantity Determination of Consumable Concurrent Spare Part Under Availability Constraint and Cannibalization Allowed

Geun-Tae Oh, Na Yoon-Kyoon, Kim Myung-Soo
Dept. of Industrial Information Engineering, University of Suwon
[$AuthorMark7$]

Abstract

In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.

Reference