Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.31 No.4 pp.86-92
DOI :

가상확률밀도함수를 사용하여 Max(N, T, D) 운5방침이 적용되는 조정가능한 M/G/1 대기모형의 busy period의 기대값 유도

이한교, 오현승
한남대학교 산업경영공학과

Derivation of the Expected Busy Period U sing its Pseudo Probability Density Function for a Controllable M/G/l Queueing Model Operating Under the Max (N, T, D) Policy

Hahn-Kyou Rhee, Oh Hyun-Seung
Department of Industrial and Management Engineering, Hannam University
[$AuthorMark7$]

Abstract

The expected busy period for the controllable M/G/1 queueing model operating under the triadic Max (N, T, D) policy is derived by using a new concept so called "the pseudo probability density function." In order to justify the proposed approaches for the triadic policy, well-known expected busy periods for the dyadic policies are recovered from the obtained result as special cases.

Reference