다중기계로 구성되는 조립전단계에서의 부품생산 일정계획
Scheduling on the Pre-assembly Stage of Multiple Fabrication Machines
Abstract
This paper analyses a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advance. The manufactured components are subsequently assembled into products. The completion time of a job(product) is measured by the latest completion time of its all components at the pre-assembly stage. The problem has the objective measure of minimizing the total weighted completion time of a finite number of jobs. Two lower bounds are derived and tested in a branch-and-bound scheme. Also, three constructive heuristic algorithms are developed based on the machine aggregation and greedy strategies. Some empirical evaluation of the performance of the proposed branch-and-bound and heuristic algorithms are also performed.
- SOGOBO_2003_v26n4_63.pdf524.2KB