Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.25 No.4 pp.40-45
DOI :

작업처리능력 제약하에서 자동창고 건설비용 최소화를 위한 연구

나윤균 , 이동하, 오근태
수원대학교 산업 정보공학과

A Solution Procedure for Minimizing AS/RS Construction Costs under Throughput Rate Requirement Constraint


[$AuthorMark7$]

Abstract

An AS/RS construction cost minimization model under throughput rate requirement constraint has been developed, whose objective function includes S/R machine cost, storage rack cost, and interrace conveyor cost. S/R machine cost is a function of the storage rack height, the unit load weight, and the control logic used by the system, while storage rack cost is a function of the storage rack height, the weight and the volume of the unit load. Since the model is a nonlinear integer programming problem which is very hard to solve exactly with large problem size, a solution procedure is developed to determine the height and the length of the storage rack with a fixed number of S/R machines, while increasing the number of S/R machines one by one to meet the throughput rate requirement.

Reference