Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.25 No.2 pp.92-101
DOI :

Tabu Search와 Constraint Satisfaction Technique를 이용한 Job Shop 일정계획

윤종준, 이화기
인하대학교 산업공학과

Job Shop Scheduling by Tabu Search Combined with Constraint Satisfaction Technique


[$AuthorMark7$]

Abstract

The Job Shop Scheduling Problem(JSSP) is concerned with schedule of m different machines and n jobs where each job consists of a chain of operations, each of which needs to be processed during an uninterrupted time period of a given length on a given machine. The purpose of this paper is to develop the efficient heuristic method for solving the minimum makespan problem of the large scale job shop scheduling. The proposed heuristic method is based on a Tabu Search(TS) and on a Constraint Satisfaction Technique(CST). In this paper, ILOG libraries is used to embody the job shop model, and a CST is developed for this model to generate the increased solution. Then, TS is employed to overcome the increased search time of CST on the increased problem size md to refine the next-current solution. Also, this paper presents the new way of finding neighbourhood solution using TS. On applying TS, a new way of finding neighbourhood solution is presented. Computational experiments on well known sets of MT and LA problem instances show that, in several cases, our approach yields better results than the other heuristic procedures discussed In literature.

Reference