Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.22 No.51 pp.117-127
DOI :

한정된 제조자원능력을 고려한 MRP-C 시스템 적용

김동규*, 박재현**, 강경식*,
명지대학교 산업공학과*, 서일대학 공업경영과**

Implementation of Finite Capacity-Driven MRP-C System


[$AuthorMark7$]

Abstract

Modern production control systems based on MRPⅡ (Manufacturing Resource planning) didn't solved about the capacity and lead time problems. In the past, It solved that problems under deterministic. Therefore, the problem about determination of correct lead time and finite capacity are studied continuously by researchers. Now, we need to a integrated method that is from low level to high level instead of top-down in MRP. In this research uses the MRP-C(Capacitated Material Requirement Planning) concept that is more efficient then MRP system for capacity and flexible lead time , and shows the MRP-C algorithm and the prototype.

Reference