Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.19 No.37 pp.53-61
DOI :

동적계획법을 이용한 업무재설계과정에서의 주요측정점 선정에 관한 연구

김창훈, 윤덕균*
한양대학교 대학원, 한양대학교 산업공학과*

The Decision of Critical Measurement Point Using Dynamic Programming in the Business Process Reengineering


[$AuthorMark7$]

Abstract

Recently the business transformaton of a company is achieved through the business process re-design and total quality management concept. This paper focused on the decision of the critical measurement point(CMP) for maximizing the effectiveness of the business process reengineering. In general, the types of business processes can be classified into two kinds, serial processes with IPO(input/process/output) type and non-serial processes with workflow type. The traditional method of selecting the CMP relies on the experiences and intuitions of the process owners. We suggest a mathematical method for more objective selection of CMP by using Dynamic Programming.

Reference