Journal Search Engine
Search Advanced Search Adode Reader(link)
Download PDF Export Citaion korean bibliography PMC previewer
ISSN : 2005-0461(Print)
ISSN : 2287-7975(Online)
Journal of Society of Korea Industrial and Systems Engineering Vol.14 No.23 pp.65-70
DOI :

Flow Shop Scheduling Problems By using Y-Shape Property

Abstract

This paper is concerned with a flow-shop scheduling problem for all jobs having the common due date using V-Shape penalty cost function for earliness and lateness. The objective of the paper is to develop an efficient heuristic scheduling algorithm for minimizing total penalty cost function and for determining the optimal common due date. In addition, the between-job-delay for two machines are considered for developing the algorithm. A numerical example is given for illustrating the proposed algorithm.

"V-shape"를 이용한 흐름작업 일정계획

노인규, 이정환
한양대학교 산업공학과, 동의대학교 산업공학과

초록


    Figure

    Table

    Reference